solution-sur-mesure-vertic-passerelle-retractable

Retractable walkway: a tailor-made solution dedicated to limited spaces

VERTIC is above all a team of engineers dedicated to the development of tailor-made fall protection solutions fitting your needs. We run an in-dept study of your working environment, safety needs and requirements, to design a tailor-made solution adapted to your teams’ activity.

 

This retractable walkway is one of our several tailor-made projects. Installed on two ALTIRAIL horizontal fall protection rails, it unfolds to allow the operator safe access to the tank just below.

 

You have safety issues and need our teams’ support?

Do not hesitate to contact us!

 

LIDL & VERTIC celebrate their one year of collaboration!

LIDL & VERTIC celebrate their one year of collaboration!

It has been one year since the beginning of our partnership with the German company LIDL, which has been established in France for nearly 25 years. Awarded for 4 consecutive years as “Best Retail Chain in all categories“, the company has also been working on the modernization of its stores and strengthening its presence in France.

 

VERTIC, the company S.T.S. Sécurité Toitures Services & the DELTA PLUS group, have mobilized specific resources to meet LIDL’s safety requirements and needs.
At this point, more than 80 stores have been secured with collective protection: crinoline ladders and nearly 22,000 meters of guardrails!

 

Proud of this partnership, we would like to give a special thank to LIDL for their trust and to all the teams for their investment.

SUNZIL & VERTIC, une successful collaboration

SUNZIL & VERTIC, a successful collaboration

What if we just go for a tour in the Islands?

Today we’re taking you to the French overseas departments & territories, visit the SUNZIL’s photovoltaic installations!

 

Worldwide manufacturer of photovoltaic plants, SUNZIL belongs to the TOTAL & EDF Group. For 2 years, we have been working together to secure their installations located in the Islands of Reunion, Martinique, Mayotte, Guadeloupe and Guyana.

 

To install within the given time the required fall protection solutions on the 530 structures, VERTIC has dedicated a specific team composed of 2 engineers and 10 installers: a great success!

 

Congratulations to them!

 


 

THE PROJECT IN FEW WORDS:

 

  • Fall protection solutions installed: horizontal lifeline systems (ALTILIGNE & BATILIGNE), anchor points, simple and caged ladders, fall protection rail system (ALTIRAIL)
  • Average time spent on each installation: from 1 to 2 days
  • Number of lifeline meters installed: 27 300 meters
  • Number of anchor points installed: 6 725 units
  • Management of 4 VERTIC offset stocks
  • April to Mai 2017 : 90 sites secured i.e. 6 000 kWp

 

  • Reunion (Island): 127 sites – 13 000 kWp
  • Martinique (Island): 148 sites – 9 800 kWp
  • Mayotte (Island): 30 sites – 4 300 kWp
  • Guadeloupe (Island): 192 sites – 13 300 kWp
  • Guyana (Island): 26 sites – 2 200 kWp
  • Total kWp : 42 600
VERTIC’s 18!

VERTIC’s 18!

Much more than the symbolic age of majority, let’s celebrate the integration of our 95 co-workers, the 8,000 projects on which we had the chance to provide you some support, and also the architectural structures and historical monuments our installation teams have secured…

 

And much more than that, let’s celebrate people who have been working safely.

 

Thank you for your support and ‘’cheers’’!

Kukkumiskaitse-VERTIC-safety-ALTIRAIL-web

Focus on… Kukkumiskaitse!

Let’s go on a tour to Estonia today, visit our partner Kukkumiskaitse.

 

Kukkumiskaitse provides complete solutions for Work at Height issues and operates daily toward the achievement of your projects.

Passionately involved, Malle & Lukas provide a wide range of services such as rope access performances, work at height trainings but also the installation of permanent solutions to prevent falls from a height.

 

With many years of expertise, they have successfully supported a water-treatment company in providing maximum safety to its teams during pond maintenance operations.

 

An impressive project that required the installation in overhead position, of a rail fall protection system ALTIRAIL of 50 meters long!.

VERTIC, totally committed to its customers & partners!

VERTIC totally committed to its customers & partners!

We were yesterday in Marsannay-la-Côte (France – Dpt 21) with our partner Norm’acces.

We have spent a full day together talking about different topics and also offering them support both on sales and on technical parts.

Many thanks to them for their participation and work!

 

VERTIC provides to its customers a complete support either onsite or at distance.

Keen to meet us and schedule a meeting? Do not hesitate to contact us using the form or by mail at vertic@vertic.fr.

VERTIC exhibiting on the SICUR in Madrid!

VERTIC exhibiting on the SICUR in Madrid!

Come and meet us in Madrid on the international trade fair for safety: the SICUR!

From 20th to 23rd February 2018, whether you are already familiar with our fall protection solutions or discovering them for the first time, come and use them in real situations!

 

We will be glad to share with you our experience and some food local specialties on booth D02 Hall 6.

 

Do not hesitate to contact us at support@vertic.fr or by phone +33(0) 476 131 215 to get free invitations!

Wishing you happy Holidays and all the best in 2018!

A big thank you for the year spent together and from all the team, we wish you the best for the coming year and a wonderful holiday season.

 

We wanted also to remind you that VERTIC & ALPIC will be closed from the 25th December 2017 to the 01st January 2018 included. Our shipments will be stopped as well until Monday 8th January due to inventory.

 

For more information, do not hesitate to contact us.

Thank you again for your trust and see you next year!

Retour en haut